Skip to content
Selected work

References

A non-exhaustive list of recent engagements across utilities, EPCs and manufacturers, searchable by year, location and discipline.

Selected customers

Some of our best customers

  • ABB (Italy, Spain, USA)
  • Antamina (Perú)
  • CESI (Italy)
  • Chinalco (Perú)
  • EDP (Portugal)
  • ELECTROPERU (Perú)
  • ELMACO (Egypt)
  • Elsewedy (Egypt)
  • EnergyAustralia (Australia)
  • Engie (Perú)
  • Gas Natural Fenosa Distribución (Spain)
  • Gas Natural Fenosa Generación (Spain)
  • Hudbay (Perú)
  • MMG Las Bambas (Perú)
  • Q Group Inc. (USA)
  • SARAS (Italy)
List of references (2019–2015)
Filter by year
Filter by location
27 results
  1. China, 2019

    Factory acceptance tests of single-phase power transformers

    Position
    Power Transformer expert
    Duties
    Factory Acceptance Tests of 230 kV 40 MVA single-phase Power Transformers.
  2. Portugal, 2019

    Design Review of a Power Transformer

    Position
    Power Transformer expert
    Duties
    Design Review of 230 kV 120 MVA Power Transformer.
  3. Perú, 2019

    Power Transformer Repair

    Position
    Transformer Expert
    Duties
    Direction of the repair work on a power transformer.
  4. Perú, 2019

    Oil Analysis and Maintenance Software

    Position
    Transformer Diagnosis Expert
    Duties
    Software supply and technology transfer in transformer dielectric oil diagnosis. Creation of a database for the transformers population.
  5. Egypt, 2019

    Transformer Factory Upgrade

    Position
    Transformer Expert
    Duties
    Feasibility analysis of the factory upgrade from 245 kV to 550 kV power transformers.
  6. Germany, 2019

    Failure Analysis of a Synchronous Motor

    Position
    Electric Machines Expert
    Duties
    Failure analysis of an 18 MW synchronous motor.
  7. Perú, 2019

    Power Transformer Active Part Inspection

    Position
    Transformer Expert
    Duties
    Active part inspection on a faulted transformer.
  8. USA, 2018

    Synchronous Generator Factory Tests

    Position
    Electric Machines Testing Expert
    Duties
    Factory tests on 240 MVA synchronous generator.
  9. Perú, 2018

    Power Transformers Procurement

    Position
    Lecturer
    Duties
    "Semana del Capítulo de Ingeniería Eléctrica, 01 al 04 octubre 2018". Exposition of the topic: Power Transformers Procurement Process, current conditions.
  10. Perú, 2018

    Power Transformers Maintenance Workshop

    Position
    Lecturer
    Duties
    Workshop on power transformers maintenance, focused on insulating oil analysis and diagnosis.
  11. Italy, 2018

    Power Transformers Life Extension

    Position
    Power Transformer Diagnostic and Maintenance expert
    Duties
    For a population of 60 power transformers in 6 power plants, including 400 kV step-up transformers and HV / MV transformers, residual life and condition of the population were established to evaluate a possible 10-year life extension. To automate the process, a database of the available oil-analysis history was created.
  12. Italy, 2018

    Power Transformers Diagnostic and Maintenance

    Position
    Power Transformer Diagnostic and Maintenance expert
    Duties
    For a 150 power-transformer population in an industrial plant, including 400 kV step-up transformers in a 600 MW power station, HV / MV, MV / MV and MV / LV transformers, a maintenance program was established, including a diagnostic-analysis tool based on DGA and oil analysis, to monitor the condition of the population in terms of: a) transformer condition assessment; b) insulating oil assessment; c) residual life. To automate the process, a database of the available oil-analysis history was created.
  13. Italy, 2018

    Quality Assurance in a Power Transformer Procurement

    Position
    Power Transformers expert
    Duties
    Quality Assurance in the procurement of a 240 MVA 400 kV step-up power transformer, including: a) technical specification; b) design review; c) manufacturing inspections; d) acceptance test inspection.
  14. Italy, 2017

    Stator Bars Failure Analysis of Large Power Station Generator

    Position
    Generator diagnostics expert
    Duties
    Root-cause study of stator-bars insulation damage in a 320 MVA power-station generator.
  15. Perú, 2017

    Design Review of a Power Transformer

    Position
    Power Transformer expert
    Duties
    Design Review of 220 kV 110 MVA Power Transformer.
  16. Perú, 2017

    Power Transformer Failure Analysis

    Position
    Power Transformer expert
    Duties
    Failure Analysis of 220 kV 110 MVA Power Transformer.
  17. Perú, 2017

    Condition assessment of MV cables

    Position
    MV cables diagnostics expert
    Duties
    Condition assessment of two MV-cable feeders to a mine mill.
  18. China, 2017

    Design Review of four power transformers

    Position
    Transformer design expert
    Duties
    Design Review of four HV (500 kV) power transformers.
  19. Italy, 2017

    Condition assessment of power transformers

    Position
    Transformer diagnostics expert
    Duties
    Condition assessment of two step-up 400 kV power transformers.
  20. Brazil, 2016

    GIS diagnostics after installation

    Position
    GIS testing expert
    Duties
    Field PD diagnostic testing (acoustic method) of GIS after installation.
  21. Italy, 2016

    Failure analysis of a power transformer

    Position
    Transformer design expert
    Duties
    Failure analysis of a step-up 400 kV power transformer.
  22. Germany, 2016

    Design Review of power transformer

    Position
    Transformer design expert
    Duties
    HVDC 400 kV AC / 500 kV DC power-transformer design review.
  23. Spain, 2015

    Power Transformers Design Software

    Position
    Transformer design expert
    Duties
    Customised transformer-design software developed for a transformer manufacturer.
  24. Spain, 2015

    Condition-Based Maintenance of power transformer

    Position
    Transformer condition assessment expert
    Duties
    Definition of CBM models for power-transformer condition assessment.
  25. China, 2015

    Design Review of power transformer

    Position
    Transformer design expert
    Duties
    Design Review of three-phase power transformer, 110 MVA 220 / 23 kV.
  26. Portugal, 2015

    Design Review of power transformer

    Position
    Transformer design expert
    Duties
    Design Review of three-phase / three-loadable-windings power transformer, 75 MVA 230 / 115 / 34.5 kV.
  27. Dominican Republic, 2015

    Failure analysis of a power transformer in CCP of Santo Domingo

    Position
    Transformer design expert
    Duties
    Failure analysis of a power-transformer explosion. Live testimony in the Dominican Republic Court of Justice.