Factory acceptance tests, site tests after installation and diagnostic tests on components in service, on every class of high-voltage component, according to IEC and IEEE standards. We check the set-up, witness the tests and compare every value with the guarantees.

HV Components Testing
Capabilities
  • Factory testing (FAT)

    Routine, type and special tests in the manufacturer’s laboratory: dielectric tests, losses, temperature rise, short-circuit withstand, partial discharges. We check the test set-up and the calibration, witness the tests and sign the report only when every value is explained. Factory acceptance tests of 230 kV single-phase transformers in China, factory tests of a 240 MVA generator in the USA.

    Factory testing (FAT)
  • Field testing

    Commissioning and acceptance tests after installation: insulation, ratio, winding resistance, frequency response, partial discharges on GIS with the acoustic method, as done on a 400 kV GIS in Brazil after installation.

    Field testing
  • Diagnostic testing

    Tests on equipment in service without dismantling it: oil sampling and dissolved-gas analysis, power factor, partial discharges, thermography, condition assessment of medium-voltage cables. The result is a condition verdict and a sampling or maintenance plan.

    Diagnostic testing
How we work

A test is only as good as its set-up and its report.

  1. 1

    Test programme

    Which tests, which standard, which acceptance values, agreed before anyone switches on a source.

  2. 2

    Set-up check

    Instruments, calibration certificates and test circuits verified before the first measurement.

  3. 3

    Witnessing

    Every test followed and every value recorded as it is measured.

  4. 4

    Report

    Results compared with the guarantees and with the design, with recommendations.

What you receive

  • Test programme
  • Test witnessing report
  • Measurement records
  • Recommendations and, for diagnostic tests, a maintenance plan
Related work
  1. China, 2019

    Factory acceptance tests of single-phase power transformers

    Position
    Power Transformer expert
    Duties
    Factory Acceptance Tests of 230 kV 40 MVA single-phase Power Transformers.
  2. USA, 2018

    Synchronous Generator Factory Tests

    Position
    Electric Machines Testing Expert
    Duties
    Factory tests on 240 MVA synchronous generator.
  3. Brazil, 2016

    GIS diagnostics after installation

    Position
    GIS testing expert
    Duties
    Field PD diagnostic testing (acoustic method) of GIS after installation.
  4. Italy, 2017

    Condition assessment of power transformers

    Position
    Transformer diagnostics expert
    Duties
    Condition assessment of two step-up 400 kV power transformers.
Contact

Which component, which standard, which date?