HV Components Testing
Factory acceptance tests, site tests after installation and diagnostic tests on components in service, on every class of high-voltage component, according to IEC and IEEE standards. We check the set-up, witness the tests and compare every value with the guarantees.

Factory testing (FAT)
Routine, type and special tests in the manufacturer’s laboratory: dielectric tests, losses, temperature rise, short-circuit withstand, partial discharges. We check the test set-up and the calibration, witness the tests and sign the report only when every value is explained. Factory acceptance tests of 230 kV single-phase transformers in China, factory tests of a 240 MVA generator in the USA.

Field testing
Commissioning and acceptance tests after installation: insulation, ratio, winding resistance, frequency response, partial discharges on GIS with the acoustic method, as done on a 400 kV GIS in Brazil after installation.

Diagnostic testing
Tests on equipment in service without dismantling it: oil sampling and dissolved-gas analysis, power factor, partial discharges, thermography, condition assessment of medium-voltage cables. The result is a condition verdict and a sampling or maintenance plan.

A test is only as good as its set-up and its report.
- 1
Test programme
Which tests, which standard, which acceptance values, agreed before anyone switches on a source.
- 2
Set-up check
Instruments, calibration certificates and test circuits verified before the first measurement.
- 3
Witnessing
Every test followed and every value recorded as it is measured.
- 4
Report
Results compared with the guarantees and with the design, with recommendations.
What you receive
- Test programme
- Test witnessing report
- Measurement records
- Recommendations and, for diagnostic tests, a maintenance plan
- China, 2019
Factory acceptance tests of single-phase power transformers
- Position
- Power Transformer expert
- Duties
- Factory Acceptance Tests of 230 kV 40 MVA single-phase Power Transformers.
- USA, 2018
Synchronous Generator Factory Tests
- Position
- Electric Machines Testing Expert
- Duties
- Factory tests on 240 MVA synchronous generator.
- Brazil, 2016
GIS diagnostics after installation
- Position
- GIS testing expert
- Duties
- Field PD diagnostic testing (acoustic method) of GIS after installation.
- Italy, 2017
Condition assessment of power transformers
- Position
- Transformer diagnostics expert
- Duties
- Condition assessment of two step-up 400 kV power transformers.
Which component, which standard, which date?
We come to the factory or to site. Tell us the component and the test you need witnessed.
- Call
- +39 331 781 7077
- Brochure
- HVCC brochure, PDF