Power Transformers
A complete package for large power transformers, from the technical specification to the end of life: design and design review, quality assurance during manufacturing, factory and field tests, diagnostics, failure analysis and remaining-life estimation. Units up to 1,000 MVA and 1,200 kV, including HVDC converter transformers.

Technical specifications
A specification that says what the machine must do and how it will be proven: ratings, impedances, losses, insulation levels, short-circuit withstand, cooling, sound, tests. Written for the buyer, so that offers are comparable and the test report can be checked line by line.

Design review and design from scratch
Review of the manufacturer’s electrical, dielectric, short-circuit, thermal and mechanical design before production, with our own calculation as the benchmark. When needed, the complete design from scratch with our Power Transformers Design program. Design reviews carried out on 230 kV to 500 kV units and on HVDC converter transformers.

Testing, factory and field
Witnessing of routine, type and special tests in the factory, including dynamic short-circuit tests, and of site tests after installation. Every measurement is compared with the guaranteed values and with the design.

Diagnostics and maintenance
Condition assessment of transformers in service: oil sampling, dissolved-gas analysis, furans, electrical measurements, inspection of the active part. Diagnostic plans for whole fleets, supported by our Oil Analysis & Maintenance program.

Failure analysis
Root-cause analysis after a failure in test or in service: inspection of the active part, reading of the test and gas records, reconstruction of the event, and a report that holds up with the manufacturer, the insurer and, if needed, in court.

Remaining life
Estimate of the residual life of a unit or a fleet from the oil-analysis history, the loading and the maintenance records, to decide between life extension, refurbishment and replacement.

The quality chain of a procurement, step by step.
- 1
Specification
Ratings, guarantees and test programme written before the tender.
- 2
Design review
The manufacturer’s design checked against our own calculation before production.
- 3
Manufacturing inspections
Core, windings, active part and tank inspected at the right moments in the factory.
- 4
Acceptance tests
Factory and site tests witnessed, report checked line by line.
- 5
Service life
Diagnostics, life extension and, if it comes to that, failure analysis.
What you receive
- Technical specification
- Design review report
- Manufacturing inspection reports
- Test witnessing report
- Condition assessment and residual-life report
- Failure-analysis report
- Italy, 2018
Quality Assurance in a Power Transformer Procurement
- Position
- Power Transformers expert
- Duties
- Quality Assurance in the procurement of a 240 MVA 400 kV step-up power transformer, including: a) technical specification; b) design review; c) manufacturing inspections; d) acceptance test inspection.
- China, 2017
Design Review of four power transformers
- Position
- Transformer design expert
- Duties
- Design Review of four HV (500 kV) power transformers.
- Germany, 2016
Design Review of power transformer
- Position
- Transformer design expert
- Duties
- HVDC 400 kV AC / 500 kV DC power-transformer design review.
- Italy, 2018
Power Transformers Life Extension
- Position
- Power Transformer Diagnostic and Maintenance expert
- Duties
- For a population of 60 power transformers in 6 power plants, including 400 kV step-up transformers and HV / MV transformers, residual life and condition of the population were established to evaluate a possible 10-year life extension. To automate the process, a database of the available oil-analysis history was created.
- Dominican Republic, 2015
Failure analysis of a power transformer in CCP of Santo Domingo
- Position
- Transformer design expert
- Duties
- Failure analysis of a power-transformer explosion. Live testimony in the Dominican Republic Court of Justice.
- Perú, 2019
Power Transformer Active Part Inspection
- Position
- Transformer Expert
- Duties
- Active part inspection on a faulted transformer.
Send us the nameplate and the stage you are at.
Specification, tender, factory, commissioning, service or failure: we tell you which of these steps applies and what it takes.