Design from scratch or upgrade of high-voltage test laboratories for transformers and other high-voltage components: test hall, sources, measuring systems, shielding, procedures and the training of the people who will run it.

HV Testing Laboratory
What it covers
  • What we design

    Layout of the test hall and of the transformer test bay; AC, impulse and DC sources; measuring systems and their calibration; shielding and grounding for partial-discharge measurements; safety interlocks; procedures for routine, type and special tests.

  • Upgrade of an existing laboratory

    Assessment of the sources and instruments you have, what is missing to test the next voltage class or the next unit power, and a plan in steps. Feasibility analysis of the upgrade of a transformer factory from 245 kV to 550 kV in Egypt.

  • Beyond the laboratory

    For a new transformer factory we can design the whole manufacturing process, from the plant layout to the machinery and the process steps that power-transformer manufacturing requires.

How we work

From the list of tests to the first test with your staff.

  1. 1

    Requirement

    Which components, which tests, up to which voltage class and unit power.

  2. 2

    Concept

    Layout, sources, measuring systems and a budget estimate.

  3. 3

    Specifications

    Technical specifications of the equipment for the tenders, and the evaluation of the offers.

  4. 4

    Commissioning

    First tests carried out together with the people who will run the laboratory.

What you receive

  • Concept study with budget estimate
  • Equipment specifications
  • Layout drawings
  • Test procedures
  • Commissioning support
Related work
  1. Egypt, 2019

    Transformer Factory Upgrade

    Position
    Transformer Expert
    Duties
    Feasibility analysis of the factory upgrade from 245 kV to 550 kV power transformers.
  2. China, 2019

    Factory acceptance tests of single-phase power transformers

    Position
    Power Transformer expert
    Duties
    Factory Acceptance Tests of 230 kV 40 MVA single-phase Power Transformers.
Contact

Send us the list of components and tests you want to run.

We come back with a concept, the equipment it needs and a rough budget.